02Early-stage study area

Bengkulu Lebong

One of the six corridors we are studying.

Corridor overview

Initial exploration of geothermal and hydro pathways, including firm power potential and regional risk factors.

Main power source

Preliminary geothermal / hydro corridor

Study status

Under energy resource screening

  1. 01

    Power first

    How large and reliable the power source is.

  2. 02

    Infrastructure

    Grid, transmission, fiber and road access.

  3. 03

    Site readiness

    Land is assessed once the power is clear.

  4. 04

    Validation

    Independent technical and commercial checks.

What we validate next

A candidate site in this corridor must pass these studies before it moves on.

  1. 01

    MW potential

  2. 02

    Firm energy

  3. 03

    Transmission

  4. 04

    Fiber

  5. 05

    Hazard

Screening priorities do not indicate a confirmed project, supplier or site.

Status and disclaimer

This corridor is an indicative preliminary study area, not a final site selection.

This corridor is an indicative preliminary study area, not a final site selection. The mention of any province, resource, utility, industrial area or infrastructure does not imply ownership, exclusivity, affiliation, project approval, power allocation or partnership. All assumptions and any candidate sites remain subject to independent validation.

Common questions

What is the Bengkulu corridor?

The Bengkulu (Lebong) corridor is one of the regions PALLAS is studying for AI data center sites. Initial exploration of geothermal and hydro pathways, including firm power potential and regional risk factors.

Which power sources are studied in Bengkulu?

Energy pathway under study: Potential geothermal and hydro resources. Capacity and time to power are still being validated.

What is still being validated?

MW potential, Firm energy, Transmission, Fiber, Hazard.

What is the status of the Bengkulu corridor?

Status: Under energy resource screening. This corridor is in early study, not exclusive and not a final site selection. Site details are shared after verification and an NDA.

Interested in this corridor?

Tell us your power, land and network needs, and we will match them against our development criteria.