A site for your next AI data center in Indonesia

Tell us your power, land and timing needs. We find and prepare a matching site, starting with its power supply.

Send site requirements

Fill in these short details. The full requirements can follow in step 2.

Your information is confidential and only used for business development purposes.

What developers usually look for

We prepare the site around your requirements, not from one fixed template.

  • 01

    Power that can grow

    A clear initial supply and a path to expand.

  • 02

    Power on time

    A realistic schedule for grid connection and infrastructure.

  • 03

    Strategic land

    A buildable core site with room to expand.

  • 04

    Fiber network

    High-capacity fiber over more than one route.

  • 05

    Development certainty

    Permits, infrastructure, stakeholder coordination and a local team.

  • 06

    Competitive cost

    Sensible power, land and infrastructure costs.

What we prepare for you

Eight parts of one site package.

  1. 01

    Site search

    Corridors, zones and candidate land that fit your needs.

  2. 02

    Energy & power

    Energy source, capacity, transmission, timing and an estimated power price.

  3. 03

    Land & expansion

    A 30–50 ha core site, land title, access and reserve land.

  4. 04

    Fiber & network

    Backbone routes, more than one path, and domestic and international access.

  5. 05

    Water, cooling & utilities

    Water supply, cooling, drainage and other utilities.

  6. 06

    Permits & government

    Zoning, KKPR, environmental review, permits and the parties involved.

  7. 07

    Deal structure

    Lease, purchase, build-to-suit, JV or another structure as needed.

  8. 08

    Investor package

    Early masterplan, site summary, commercial package and a restricted data room.

Tell us what you need

The clearer your needs, the better the site we can prepare.

  • Power

    50 MW · 100 MW · 250 MW · 500 MW · 1 GW+

  • Target start

    Year / quarter

  • Land

    Area (ha) · Core site · Reserve land

  • Energy source

    Geothermal · Hydro · Gas · Renewable · Hybrid · Grid

  • Renewable target

    Percentage or portfolio requirement

  • Cooling

    Air · Liquid · Hybrid

  • Fiber

    Capacity · Route diversity · International access

  • Deal structure

    Long-term lease · Acquisition · Build-to-suit · Joint venture · Other

  • Region

    Preferred region or open to several corridors

After you send your requirements

Open the part you need.

The steps

7 steps from first requirements to a development package.
  1. 01

    Send requirements

    Through this form

  2. 02

    We review

    Review and clarify

  3. 03

    First call

    A first discussion

  4. 04

    NDA

    When needed

  5. 05

    Site matching

    Matching corridors or sites

  6. 06

    Site review

    Restricted data access

  7. 07

    Development talks

    Structure and next steps

Information opens in stages

What information opens at each stage.

Stage 1 — Public

  • Corridor overview
  • Early energy outlook
  • Design targets
  • How we work
  • General infrastructure picture

Stage 2 — After qualification / NDA

  • Candidate site summary
  • Power pathway
  • Land summary
  • Fiber picture
  • Early masterplan
  • Permit pathway
  • Approved study extracts

Stage 3 — Restricted site access

  • Exact coordinates
  • Land documents
  • Detailed power study
  • Transmission route
  • Detailed fiber route
  • Environmental documents
  • Detailed commercial information
  • Transaction documents

Information access is not automatic. Qualification, internal approval and an NDA are required before confidential data is released.

Request site access

Deal structures to choose from

Deal structures we can evaluate together.
  1. 01

    Long-term land lease

    Core and reserve land on a long-term lease.

  2. 02

    Staged land purchase

    Bought in stages once technical, commercial and market conditions are met.

  3. 03

    Build-to-suit

    The site and supporting infrastructure are built to your needs.

  4. 04

    Joint venture

    A joint project company with land, energy, capital or expertise as contributions.

  5. 05

    Development agreement

    We develop the site and its supporting package under an agreed mandate.

The final model depends on the site, partner structure, regulation, financing and definitive agreements.

Why work with PALLAS

What PALLAS brings to your project.
  • Energy first
  • Several corridors screened
  • Local development team
  • Site control from the start
  • Strategic partnerships
  • Global market reach

Looking for a site for your next AI data center?

Tell us your power, land, timing and cooling needs. We will find the best-matching corridors and sites.