04Early-stage study area

Central Java Kendal / Batang / Dieng

One of the six corridors we are studying.

Corridor overview

Assessment of grid, gas, geothermal and solar power within Central Java’s industrial ecosystem, including time to power.

Main power source

Grid + gas + geothermal + solar corridor

Study status

Preliminary corridor screening

  1. 01

    Power first

    How large and reliable the power source is.

  2. 02

    Infrastructure

    Grid, transmission, fiber and road access.

  3. 03

    Site readiness

    Land is assessed once the power is clear.

  4. 04

    Validation

    Independent technical and commercial checks.

What we validate next

A candidate site in this corridor must pass these studies before it moves on.

  1. 01

    Time to power

  2. 02

    Industrial infrastructure

  3. 03

    Fiber

  4. 04

    Land

Screening priorities do not indicate a confirmed project, supplier or site.

Status and disclaimer

This corridor is an indicative preliminary study area, not a final site selection.

This corridor is an indicative preliminary study area, not a final site selection. The mention of any province, resource, utility, industrial area or infrastructure does not imply ownership, exclusivity, affiliation, project approval, power allocation or partnership. All assumptions and any candidate sites remain subject to independent validation.

Common questions

What is the Central Java corridor?

The Central Java (Kendal / Batang / Dieng) corridor is one of the regions PALLAS is studying for AI data center sites. Assessment of grid, gas, geothermal and solar power within Central Java’s industrial ecosystem, including time to power.

Which power sources are studied in Central Java?

Energy pathway under study: Grid + gas + geothermal + solar. Capacity and time to power are still being validated.

What is still being validated?

Time to power, Industrial infrastructure, Fiber, Land.

What is the status of the Central Java corridor?

Status: Preliminary corridor screening. This corridor is in early study, not exclusive and not a final site selection. Site details are shared after verification and an NDA.