01Early-stage study area

North Sumatra Sarulla / Tapanuli

One of the six corridors we are studying.

Corridor overview

Early geothermal-led corridor study, assessing transmission access, fiber connectivity and the suitability of strategic land.

Main power source

Geothermal-led AI energy corridor

Study status

Preliminary corridor screening

  1. 01

    Power first

    How large and reliable the power source is.

  2. 02

    Infrastructure

    Grid, transmission, fiber and road access.

  3. 03

    Site readiness

    Land is assessed once the power is clear.

  4. 04

    Validation

    Independent technical and commercial checks.

What we validate next

A candidate site in this corridor must pass these studies before it moves on.

  1. 01

    Resource expansion

  2. 02

    Transmission

  3. 03

    Fiber

  4. 04

    Strategic land

Screening priorities do not indicate a confirmed project, supplier or site.

Status and disclaimer

This corridor is an indicative preliminary study area, not a final site selection.

This corridor is an indicative preliminary study area, not a final site selection. The mention of any province, resource, utility, industrial area or infrastructure does not imply ownership, exclusivity, affiliation, project approval, power allocation or partnership. All assumptions and any candidate sites remain subject to independent validation.

Common questions

What is the North Sumatra corridor?

The North Sumatra (Sarulla / Tapanuli) corridor is one of the regions PALLAS is studying for AI data center sites. Early geothermal-led corridor study, assessing transmission access, fiber connectivity and the suitability of strategic land.

Which power sources are studied in North Sumatra?

Energy pathway under study: Geothermal as the initial energy pathway. Capacity and time to power are still being validated.

What is still being validated?

Resource expansion, Transmission, Fiber, Strategic land.

What is the status of the North Sumatra corridor?

Status: Preliminary corridor screening. This corridor is in early study, not exclusive and not a final site selection. Site details are shared after verification and an NDA.

Interested in this corridor?

Tell us your power, land and network needs, and we will match them against our development criteria.