05Early-stage study area

East Java Gresik

One of the six corridors we are studying.

Corridor overview

Study of grid capacity, gas/LNG and existing industrial infrastructure for potential data-center development, subject to further validation.

Main power source

Grid + gas/LNG + industrial infrastructure corridor

Study status

Preliminary corridor screening

  1. 01

    Power first

    How large and reliable the power source is.

  2. 02

    Infrastructure

    Grid, transmission, fiber and road access.

  3. 03

    Site readiness

    Land is assessed once the power is clear.

  4. 04

    Validation

    Independent technical and commercial checks.

What we validate next

A candidate site in this corridor must pass these studies before it moves on.

  1. 01

    Bulk power

  2. 02

    Gas pathway

  3. 03

    Fiber

  4. 04

    Water

  5. 05

    Industrial ecosystem

Screening priorities do not indicate a confirmed project, supplier or site.

Status and disclaimer

This corridor is an indicative preliminary study area, not a final site selection.

This corridor is an indicative preliminary study area, not a final site selection. The mention of any province, resource, utility, industrial area or infrastructure does not imply ownership, exclusivity, affiliation, project approval, power allocation or partnership. All assumptions and any candidate sites remain subject to independent validation.

Common questions

What is the East Java corridor?

The East Java (Gresik) corridor is one of the regions PALLAS is studying for AI data center sites. Study of grid capacity, gas/LNG and existing industrial infrastructure for potential data-center development, subject to further validation.

Which power sources are studied in East Java?

Energy pathway under study: Grid + gas/LNG and industrial ecosystem. Capacity and time to power are still being validated.

What is still being validated?

Bulk power, Gas pathway, Fiber, Water, Industrial ecosystem.

What is the status of the East Java corridor?

Status: Preliminary corridor screening. This corridor is in early study, not exclusive and not a final site selection. Site details are shared after verification and an NDA.